As per Nepal Electricity Authority (NEA), Nepal has ended load-shedding in the industrial sector as well.
The Backstory:
- It has been around a year since the load-shedding in the residential area ended.
- NEA released a statement on Sunday, saying that the load-shedding would be stopped from Monday.
- Until Saturday, industrial areas had a daily load shedding of 3 hours.
Why it matters:
- This marks the complete end of load-shedding in Nepal. Back in September 2016, load-shedding first ended in Kathmandu valley and eventually it ended throughout the country.
- According to NEA Managing Director Kulman Singh Ghising, load-shedding was ended formally due to rise in water level in the rivers boosting electricity production from the run-of-the-river hydropower projects, managing available electricity better and increasing the import of electricity from India.
Editor’s Recommendations
- Siemens Selected by NEA to Enhance Capacity of Load Dispatch Center
- NEA has Discredited All Rumors About Continuing Load-shedding
- NEA to Produce 800MW Power in the Next 18 Months
The Latest
-
Tecno Spark Go 2 Launched in Nepal with a “Free Calling Feature”? What’s going on?HIGHLIGHTS The Tecno Spark Go 2 price in Nepal starts at Rs. 11,499 (3/64GB). It…
-
Samsung Galaxy S25 FE Launching Soon in Nepal: FE Finally Gets LTPO DisplayHIGHLIGHTS The Samsung Galaxy S25 FE price in Nepal is Rs. 99,999 (8/256GB). The FE…
-
Get Even More Discounts on Galaxy Watches & Buds with Multi Buy Offer!HIGHLIGHTS Samsung is offering discounts ranging from 20 to 53% on select wearable devices. Buyers…