As per Nepal Electricity Authority (NEA), Nepal has ended load-shedding in the industrial sector as well.
The Backstory:
- It has been around a year since the load-shedding in the residential area ended.
- NEA released a statement on Sunday, saying that the load-shedding would be stopped from Monday.
- Until Saturday, industrial areas had a daily load shedding of 3 hours.
Why it matters:
- This marks the complete end of load-shedding in Nepal. Back in September 2016, load-shedding first ended in Kathmandu valley and eventually it ended throughout the country.
- According to NEA Managing Director Kulman Singh Ghising, load-shedding was ended formally due to rise in water level in the rivers boosting electricity production from the run-of-the-river hydropower projects, managing available electricity better and increasing the import of electricity from India.
Editor’s Recommendations
- Siemens Selected by NEA to Enhance Capacity of Load Dispatch Center
- NEA has Discredited All Rumors About Continuing Load-shedding
- NEA to Produce 800MW Power in the Next 18 Months
The Latest
-
Leapmotor B10 in Nepal: Fresh Design, Strong Value, or Missed Marks?HIGHLIGHTS Leapmotor B10 price in Nepal starts at Rs. 49.99 Lakhs and goes up to…
-
Hero XPulse 210 Unveils Tomorrow in Nepal at NADA Auto Show: Big Upgrade or Not?HIGHLIGHTS Hero XPulse 210 is set to arrive in Nepal at the upcoming NADA Auto…
-
Deepal S05 Launches in Nepal, Shaking Up the Mid-Size Electric SUV SegmentHIGHLIGHTS Deepal S05 price in Nepal starts at Rs. 49.99 Lakhs. S05 is a mid-size…