As per Nepal Electricity Authority (NEA), Nepal has ended load-shedding in the industrial sector as well.
The Backstory:
- It has been around a year since the load-shedding in the residential area ended.
- NEA released a statement on Sunday, saying that the load-shedding would be stopped from Monday.
- Until Saturday, industrial areas had a daily load shedding of 3 hours.
Why it matters:
- This marks the complete end of load-shedding in Nepal. Back in September 2016, load-shedding first ended in Kathmandu valley and eventually it ended throughout the country.
- According to NEA Managing Director Kulman Singh Ghising, load-shedding was ended formally due to rise in water level in the rivers boosting electricity production from the run-of-the-river hydropower projects, managing available electricity better and increasing the import of electricity from India.
Editor’s Recommendations
- Siemens Selected by NEA to Enhance Capacity of Load Dispatch Center
- NEA has Discredited All Rumors About Continuing Load-shedding
- NEA to Produce 800MW Power in the Next 18 Months
The Latest
-
TechLekh Awards – Best Phones of 2024 in Nepal Winners!Smartphones have become indispensable in our daily lives, fundamentally transforming how we navigate the world.…
-
Redmi Note 14 5G Also Makes Way to Nepal This Time!HIGHLIGHTS Redmi Note 14 5G price in Nepal is Rs. 30,999 (8/256GB) and Rs. 35,999…
-
Redmi Note 14 Pro 5G Launched in Nepal—Possibly the Best Midrange This Year!HIGHLIGHTS Redmi Note 14 Pro price in Nepal is Rs. 39,999 (8/256GB) and Rs. 44,999…
-
Redmi Note 14 Pro+ 5G Arrives in Nepal, What’s New Though?HIGHLIGHTS Redmi Note 14 Pro+ price in Nepal is Rs. 49,999 (8/256GB) and Rs. 54,999…