{"id":28773,"date":"2018-02-14T17:00:11","date_gmt":"2018-02-14T11:15:11","guid":{"rendered":"https:\/\/techlekh.com\/?p=28773"},"modified":"2018-02-14T12:24:22","modified_gmt":"2018-02-14T06:39:22","slug":"chameliya-hydropower-officially-begins-power-production","status":"publish","type":"post","link":"https:\/\/techlekh.com.\/chameliya-hydropower-officially-begins-power-production\/","title":{"rendered":"Chameliya Hydropower Officially Begins Power Production"},"content":{"rendered":"
\"\"
Image Courtesy: The Kathmandu Post<\/figcaption><\/figure>\n

The Chameliya Hydropower Project has been connected to the national grid from Sunday, 11th<\/sup> Feb, 2018.\u00a0Prime Minister Sher Bahadur Deuba inaugurated the hydropower project after completing entire tests of two production unit the day before.<\/p>\n

Why it Matters:<\/strong><\/h4>\n

Chameliya Hydropower Project located at Balach of Darchula district is a 30 MW project with two turbines of capacity 15 MW each. Since its commercial operation, it has become that largest hydropower project in Province-7.<\/p>\n

What they are saying:<\/strong><\/h4>\n